Tasks:On the basis of plans for design and research work on capital construction objects, JSC "Ukrgazvydobuvannya" organizes and is responsible for high-quality, timely development of technological process automation systems, including automated technological process control systems (ACS TP) in the design and costing documentation (PCD) of the projects of arrangement, reconstruction, capital repair of oil and gas fields, processing facilities of the company in order to implement the plan of extr
Tasks:
- On the basis of plans for design and research work on capital construction objects, JSC "Ukrgazvydobuvannya" organizes and is responsible for high-quality, timely development of technological process automation systems, including automated technological process control systems (ACS TP) in the design and costing documentation (PCD) of the projects of arrangement, reconstruction, capital repair of oil and gas fields, processing facilities of the company in order to implement the plan of extraction and processing of hydrocarbons.
Understanding of the complex of technical and software tools necessary for the automatic management of the technological process, knowledge of the regulatory and legal framework in the design of construction objects in the oil and gas industry, building a system based on serially produced software and technical complexes.
Understanding the technological process of extraction, processing, transportation, storage in the oil and gas industry; method of building and implementing an automated system, interconnected functioning with adjacent systems;Responsibilities:
- Using the requirements of international standards ISA-95, IEC 62264-ДСТУ-ДСТУ EN 62264-1:2019, ANSI/ISA-101.01-2015 "Human Machine Interfaces for process Automation Systems".
- Working on a personal computer, owning automated design programs (AutoCAD, Nevisworks, Revit).